Document intelligence across contracts and drawings
The scope miss is on page 240 of the spec, in a drawing revision three cycles back, or in a clause of the owner contract nobody re-read before the trade bought out.
Who benefits · Preconstruction leads, project executives, and the owner development team.
- Inputs
- The owner-GC contract, the issued-for-construction drawing set across revisions, the project specification, the trade subcontracts, and the submittal register.
- What the system does
- Contracts, drawings, and specs are indexed as structured documents, not as opaque files. A question returns the exact clause, the sheet, or the spec section, with every answer carrying a citation.
- Output
- A direct answer with the clause, the sheet, and the revision that back it up; conflicts across documents are flagged rather than silently resolved.
- Benefit
- The scope miss shows up in preconstruction instead of in a change order. The team spends time on the exceptions, not on the reading.
- Human stays here
- The system cites every answer. When documents conflict, it surfaces the conflict and never picks one; a human owner makes the call.