Skip to content

AI for Architecture

The answer is in the drawing set. Finding it takes an afternoon.

We engineer AI for architecture practices: drawing and spec search across every sheet, submittal and RFI replies drafted from the record, proposal assembly from past work, and a portfolio you own outright.

Built on your own files, your own templates, and the review discipline your principals already run.

The operational reality

A project runs on documents. Hundreds of sheets. Thousands of pages of spec.

The answer is in the drawing set. Finding it costs an afternoon.

The studio should design. The paperwork should answer itself.

Felt by principals, project architects, BIM directors, and the studio operations lead who stitches the schedule together between all of them.

  1. 01

    Drawing production

    Project architects author the drawing set in Revit or AutoCAD against the firm standards and the project brief, coordinating with structural and MEP consultants.

    Friction · Coordination issues surface late, after the sheet set is already issued.

  2. 02

    Specification writing

    The spec writer assembles division-by-division specs for the project, pulling from firm masters and the latest manufacturer data.

    Friction · Hours disappear re-reading long specs to find the clause that already answered the question.

  3. 03

    Submittal and RFI review

    During construction administration, submittals and RFIs land weekly. The project architect reviews each one against the drawings, the specs, and the contract.

    Friction · The relevant detail is on a sheet three revisions back, in a spec section the reviewer did not write.

  4. 04

    Proposal and portfolio

    The studio responds to RFPs and shortlists, assembling the right past projects, the right team bios, and the right narrative for each pursuit.

    Friction · Every proposal rebuilds the same past-project writeups and the same team bios from scratch.

  5. 05

    Handover and record set

    At project close, the record drawings, as-builts, and closeout documents are archived for the client and for the practice reference.

    Friction · The archive is searchable only by whoever filed it. A year later, nobody remembers where.

Swipe the workflow

Where the work breaks

The friction is in the places nobody budgets for.

  • 01

    The detail is in the drawing set. Finding it eats the morning.

    How we fix it · A system we build catches this before it costs you.

    Impact · Project architects lose design hours to document search; junior staff get sent on fetch quests instead of learning the work.

  • 02

    Submittal and RFI replies rebuild clinical reasoning that is already in the record.

    How we fix it · A system we build catches this before it costs you.

    Impact · Replies run longer than they should; the schedule slips while the contractor waits on the architect.

  • 03

    Specs are long and precise, and nobody has time to re-read them.

    How we fix it · A system we build catches this before it costs you.

    Impact · Fire ratings, accessibility clearances, and energy requirements get restated inconsistently across RFIs and submittals.

  • 04

    Proposals rebuild past-project writeups from scratch every time.

    How we fix it · A system we build catches this before it costs you.

    Impact · Senior staff spend weekend hours on pursuits instead of design review; the firm wins on the proposals it had time to polish, not the ones it should.

  • 05

    The portfolio site is rented, slow, and routes every edit back through a vendor.

    How we fix it · A system we build catches this before it costs you.

    Impact · The studio pays monthly for a site that loads slowly and does not represent the work; small edits take weeks.

What we would build

Systems, not features. Each with its own job.

  • 01

    Drawing and spec search across the project

    The answer is on a sheet or in a spec section. Finding which one takes longer than the question deserves.

    Who benefits · Principals, project architects, and junior staff preparing a review.

    Inputs
    The project drawing set across every revision, the specification sections, the firm masters, and the project RFIs and submittals already issued.
    What the system does
    Drawings and specs are indexed as pages and callouts, not as opaque files. A question returns the matching sheet, the exact callout, and the surrounding context, with every answer carrying a page citation.
    Output
    A direct answer, the sheet number and callout it came from, and the top three citations the reviewer can open before trusting the answer.
    Benefit
    Document search drops from an afternoon to under a minute. The design hours stay with design.
    Human stays here
    The system cites every answer. When retrieval confidence is low, it refuses and routes the question to a project architect rather than guessing.
  • 02

    Submittal and RFI review that drafts the reply

    Every submittal and RFI rebuilds the same clinical reasoning that already lives in the drawings and the specs.

    Who benefits · Project architects and the construction-administration lead.

    Inputs
    The incoming submittal or RFI, the current issued-for-construction drawing set, the specification, the contract, and the firm standard review checklists.
    What the system does
    The system matches the submittal or RFI to the relevant sheets and spec sections, drafts a response in the firm voice with the clauses that apply, and flags anywhere the submittal diverges from the record.
    Output
    A drafted reply with every clinical claim linked to the sheet, the spec section, or the contract clause behind it.
    Benefit
    Reviews return in days rather than weeks. The project architect spends time on the exceptions, not on the routine.
    Human stays here
    A project architect reviews, edits, and signs every reply. The system never issues to the contractor on its own.
  • 03

    Proposal assembly from past work

    Every proposal rebuilds the same past-project writeups, the same team bios, and the same narrative sections.

    Who benefits · Principals, the business-development lead, and studio operations.

    Inputs
    Past project writeups, team bios, imagery metadata, the firm track record, and the RFP or shortlist brief for the current pursuit.
    What the system does
    The system matches the brief to the past projects that fit, drafts the narrative sections in the studio voice, assembles team bios in the required format, and lays out the response against the RFP structure.
    Output
    A drafted proposal response with the right past projects, the right bios, and the narrative sections ready for a principal to sharpen.
    Benefit
    Pursuit turnaround compresses from weeks to days. The studio pursues more of what it should, not just what it had time to write.
    Human stays here
    A principal reviews and signs off before anything is sent. Imagery and project claims are checked against the record.
  • 04

    An owned portfolio that loads fast

    A rented portfolio site routes every edit back through a vendor, loads slowly, and competes with the buildings for attention.

    Who benefits · The principal, the studio operations lead, and the person who answers the enquiry inbox.

    Inputs
    The practice project archive, photography, project narratives, and the studio brand standards.
    What the system does
    A static, image-optimised site is built around the project archive and handed over for the practice to own outright, with content models the studio can update without a vendor.
    Output
    A fast, owned portfolio site that the buildings carry, with no monthly dependency on a vendor to publish an edit.
    Benefit
    The studio stops renting the shop window. New enquiries open faster, and the site reads like the practice, not a template.
    Human stays here
    Editorial sign-off stays with the principal. The content model enforces the firm standards for how a project is published.
  • 05

    Project knowledge that outlives the project

    A year after closeout, nobody remembers where the record drawings, the as-builts, or the warranty documents are.

    Who benefits · Studio operations, the BIM director, and anyone staffing a renovation of a past project.

    Inputs
    Record drawings, as-builts, closeout documents, specifications, and the project correspondence archive.
    What the system does
    The archive is indexed as a per-project retrieval system with hard project boundaries. A question returns the exact document, the page, and the date it was issued.
    Output
    A searchable project record that answers questions in seconds, with every answer citing the source document and revision.
    Benefit
    The practice stops rebuilding its own knowledge each time a past client comes back for a renovation or a tenant improvement.
    Human stays here
    Access respects the project boundary; the archive refuses to cross between client records without an explicit scope.

Show the system

What it could look like in your hands.

A design concept, not a shipped product. Interfaces like this get drawn out before any code lands, so the system reads back the way the people using it work.

studio / drawing search

Project drawing set

Riverside Mixed-Use, concept study

Design development · 184 sheets · 42 spec sections

  • A-101Site plan
  • A-102Site sections
  • A-201Floor plan, Level 1
  • A-202Floor plan, Level 2
  • A-203Floor plan, Level 3
  • A-301Building sections
  • A-401Exterior elevations, north and south
  • A-501Wall types and partitions
  • A-601Door schedule
  • A-701Interior details, typical
What is the fire rating of the demising wall between retail and residential?

Results

  • A-501

    Fire-rated wall assembly, 2-hour rating

    94%

    Type W-2A: 2-hour fire-rated assembly, demising wall between retail (Group M) and residential (Group R-2). Refer to UL U419 for the assembly, with gypsum board returns at head and sill per detail 3 / A-701.

    cite · A-501, page 1 of 1, Issued 2026-08-14

  • Spec 07 84 00

    Firestopping at penetrations

    78%

    All penetrations through 2-hour rated assemblies to be firestopped to UL-tested systems. Submittals required for each unique penetration type.

    cite · 07 84 00, 2.1.A, Issued 2026-08-14

  • A-701

    Detail 3, head and sill of demising wall

    72%

    Head condition at structure: gypsum board returns to deck, firestopping continuous. Sill condition at slab: 1-hour rated base per code requirement.

    cite · A-701, detail 3, Issued 2026-08-14

Synthetic data. This is a design concept of how a question against a project drawing set and specification could return a sheet, a callout, and the citations behind the answer.

End-to-end workflow

From the trigger to the outcome.

A representative question path, from a project architect asking a question to a signed reply going out to the contractor. Automated stages run the moment the submittal or RFI lands; human stages are explicit and never skipped.

  1. 01

    Submittal or RFI arrives

    The incoming item is ingested from the construction administration platform (Procore, Autodesk Construction Cloud, or email) and classified by scope and discipline.

    Automated
  2. 02

    Project context pulled

    The current issued-for-construction drawing set, the relevant specification sections, and the contract are retrieved. Older revisions are tagged so a reviewer can see what changed and when.

    Integration
  3. 03

    Reply drafted against the record

    The system drafts the reply in the firm voice, with every clinical claim linked to the sheet, the spec section, or the contract clause behind it.

    Automated
  4. 04

    Low-confidence passages flagged

    Passages where retrieval confidence is low, where the drawing is ambiguous, or where the question falls outside the record, are flagged for a project architect rather than guessed.

    Guardrail
  5. 05

    Project architect reviews and signs

    The draft reply, the citations, and any flagged passages are reviewed. The project architect edits and signs; nothing is issued without them.

    Human in loop
  6. 06

    Reply issued to the record

    The signed reply is written back to the construction administration platform, logged with the signing architect and the sheet revisions it referenced.

    Integration
  7. 07

    Project knowledge updated

    The question, the reply, and the citations become part of the project record so the next review draws on them automatically.

    Automated

How exceptions are handled

  • If a question falls outside the issued record, the system refuses to answer and routes it to a project architect for a design decision.
  • If a drawing is ambiguous between revisions, the system flags the ambiguity and surfaces every revision rather than picking one.
  • If the spec contradicts the drawing, the system marks the conflict and never silently resolves it.
  • If a submittal references a product that was not specified, the system notes the substitution request and never approves it automatically.

How it is engineered

Built on your stack, not ours.

Design choices that let this run in a working studio, not a demo. We build to your authoring tools, your construction administration platform, and your file archive, not to our stack.

01

Authoring integration

Reads from Revit and AutoCAD exports, published PDF sets, and the firm specification masters. Writes nothing back into the authoring environment; the drawing of record remains the drawing of record.

02

Construction administration integration

Reads and writes against Procore, Autodesk Construction Cloud, and Bluebeam Studio where the practice uses them. Honours each platform permissioning so the system never sees what the project architect could not.

03

Document ingestion

Drawings and specs are OCRd on ingest, with callouts and detail numbers parsed as structured anchors. Every answer carries a page and a callout, not a vague file reference.

04

Retrieval

A per-project retrieval index with hard project boundaries. The archive refuses to cross between client records; a question against one project cannot pull a citation from another.

05

Model choice

Specialty-aware models for drafting replies in the firm voice; deterministic rules for code-reference checks and version diffs. Models are picked for cost, latency, and accuracy on the firm own documents.

06

Observability and evaluation

Every draft and every retrieval is logged with the model version, the inputs, and the architect edits. An evaluation harness watches drift against the firm review standard.

What the business will measure

Numbers the operator already watches.

We agree on metrics and baselines before building. These are the numbers a working practice usually watches when deciding whether a system is pulling its weight.

  • 01

    Time to find a referenced detail

    Baseline today

    Measured today in a short time-and-motion study: minutes from a question raised to the detail retrieved, by project architect and project.

    How it moves

    A one-question search returns the sheet, the callout, and the citations the reviewer can open before trusting the answer.

  • 02

    Submittal and RFI cycle time

    Baseline today

    Measured from the construction administration platform: median days from submittal received to reply issued, by project and reviewer.

    How it moves

    Replies are drafted the moment the submittal lands, with citations prepared. The architect reviews, edits, and signs; the routine passes in a day.

  • 03

    Proposal turnaround

    Baseline today

    Measured from the business-development log: days from brief received to proposal issued, by pursuit and lead principal.

    How it moves

    Past projects and team bios are assembled against the RFP structure; the principal spends time sharpening the narrative, not rebuilding it.

  • 04

    Portfolio-to-pitch conversion

    Baseline today

    Measured from the enquiry log: pursuits reached, shortlists landed, and projects won, by lead source.

    How it moves

    An owned portfolio that loads fast and reads like the practice, so new enquiries land warmer than they do today.

  • 05

    Archive retrieval success

    Baseline today

    Measured as the share of past-project questions answered without a senior staff member being paged.

    How it moves

    A per-project retrieval index that answers questions with citations, so renovations and tenant improvements start with the record already pulled.

Human in the loop

Oversight, licensing, and the record of authorship

Where the humans stay in control.

The system is designed around what principals, licensing boards, and clients already expect. Nothing is autonomous that should not be.

  • 01

    Licensed authorship

    Every reply, every drawing revision, and every stamped submittal remains the work of a licensed architect. The system drafts; the architect signs.

  • 02

    Code and compliance

    Code references (IBC, state amendments, Title 24, ADA) are cited verbatim with their source. The system never asserts a code outcome without the clause behind it.

  • 03

    Project boundary

    The retrieval index enforces a hard project and client boundary. A question against one project cannot see another; archives do not cross without an explicit scope.

  • 04

    Revision discipline

    Every citation carries the sheet revision and issue date. The system treats a superseded revision as superseded, not as current.

  • 05

    Attribution and audit

    Every automated draft logs the model version, the inputs, and the architect edits. Audits can reconstruct how a reply was composed.

  • 06

    Low-confidence refusal

    When retrieval or extraction confidence is below threshold, the system returns "not found" rather than guessing. Ambiguity across revisions is surfaced, not resolved silently.

Proof

Work we have shipped, and the shape of what we build.

Real engagements where we can speak to them, and representative use cases where we cannot.

How the build runs

Scoped tightly, shipped in phases.

Fixed price per phase, approved before the phase starts. You own the code, the models, the index, and the deployment. No ongoing retainer dependency.

  1. 01

    Discovery

    Two weeks. We sit with a project architect for a day, walk the review discipline, and agree on the metrics we will move and how we will baseline them.

  2. 02

    Prototype on real projects

    Four to six weeks. One live project, one review workflow, one proof of mechanism. The project architect uses it alongside the current review; we measure against the baseline.

  3. 03

    Production rollout

    Eight to twelve weeks. Authoring and construction administration integrations, firm identity and single sign-on, audit trails, the evaluation harness, and the review workflow the principals signed off on.

  4. 04

    Handover

    You get the full source, the runbooks, the evaluation suite, and a two-week walkthrough with the BIM director and whoever owns IT.

  5. 05

    Optional ongoing support

    A fixed-term support agreement for model-drift monitoring, platform interface changes, and firm-standard updates. Never a retainer dependency.

Common questions

Answers before the first call.

01Which authoring tools and platforms do you integrate with?
We read from Revit, AutoCAD, Bluebeam, Procore, Autodesk Construction Cloud, and your specification master. We write back only through surfaces each platform approves. The drawing of record stays the drawing of record; the system never edits it directly.
02Where do our drawings and specs live?
In your tenant or in a dedicated environment we operate for you, encrypted at rest and in transit. Minimum-necessary access, no retention at inference time, and no training on your project data. The retrieval index enforces a hard project and client boundary.
03Will this stamp drawings or decide code compliance?
No. The system drafts replies, summarises specs, assembles proposals, and indexes archives. Every reply, every drawing revision, and every stamped submittal remains the work of a licensed architect. We cite the code; the architect decides compliance.
04What happens when the model is wrong?
Every reply is a draft until a project architect signs it. Low-confidence passages are flagged, retrieval refuses when it is not sure, and every automated action logs the model version and inputs so an audit can reconstruct it. We treat errors as a product metric, not an afterthought.
05Can you work alongside our existing tools and our existing site?
Yes. We often start by replacing one piece (drawing search, or a portfolio rebuild) while the rest of the stack stays in place, and expand only where the measured outcome justifies it.

Next step

A thirty-minute conversation. Bring one live project with a submittal or RFI backlog, and we will walk through what the first phase would look like, where the measurements come from, and what has to be true for your principals to sign off.

Helpful to have on the call

Helpful to have on the call: the authoring tools and construction administration platform you run, one live project with a review bottleneck, and the principal who owns the metric you would like to move.

An AI-First Engineering Company

Get a price in one call.

One 30-minute call. You leave with an architecture, a fixed price, and a start date, walked through with you. No charge, and nothing you did not ask for.